logo-horizontal-black@132x48
MENU
  • VIVI
Hot News
[Photosphere] Where is CELESTA RISE in the main route of South Saigon Residence?
Cam Ranh Bay floor plans – 10 condotel layouts of Cam Ranh Bay
[VIDEO] Location of Sunshine Diamond River District 7 is worth for buying?
21 apartment layouts Tower A1 – A2 – A3 Sunshine Diamond River
[VIDEO] Landscape 3D Rendering Sunshine Diamond River District 7
Booking Shophouse Sunshine City Saigon – Tower S2 – S3 – S4 – S7
39 apartment layouts Tower S7 Sunshine City Saigon
Is Tower S7 Sunshine City Saigon worth buying?
Sunshine City Saigon Policy 03-2019
Which tower will be opened for selling in Sunshine City Saigon Phase 2?

Latest News

Celesta Rise Keppel Land

[Photosphere] Where is CELESTA RISE in the main route of South Saigon Residence?

Mặt bằng tầng Cam Ranh Bay - 10 kiểu căn hộ dự án Cam Ranh Bay - Cam Ranh Bay floor plans - 10 condotel layouts of Cam Ranh Bay Project

Cam Ranh Bay floor plans – 10 condotel layouts of Cam Ranh Bay

Vị trí Sunshine Diamond River Quận 7 - Location of Sunshine Diamond River District 7

[VIDEO] Location of Sunshine Diamond River District 7 is worth for buying?

21 apartment layouts Tower A1 – A2 – A3 Sunshine Diamond River

Phối cảnh 3D Sunshine Diamond River - Landscape 3D Rendering Sunshine Diamond River

[VIDEO] Landscape 3D Rendering Sunshine Diamond River District 7

Tags

Thẻ
3D Apartment Beach Villas Ben Van Don street Cam Lam Investment Ltd. Cam Ranh Bay Cam Ranh Bay - Phase 1 Cat Lai Port Clip Condotel District 2 District 4 District 7 District 10 East Zone Gem Riverside Gem Riverside Project High-class apartment Hoi An Khanh Hoa Province Kingdom 101 Lanscape Malibu Hoi An Malibu Hoi An faqs My Thuy Interchange new city New City Thu Thiem Photosphere Real estate Smart apartment South of Saigon South zone South zone real estate Sunshine City Sunshine City Saigon Sunshine City Saigon - Payment Sunshine City Saigon - Phase 1 Sunshine City Saigon - Phase 2 Sunshine City Saigon - Phase 3 Sunshine City Saigon - Policy Sunshine City Saigon - Price Sunshine Diamond River Sunshine Diamond River - Phase 1 Sunshine Group Villa

Trang chủ » Articles » Opening subway at My Thuy interchange from Jan 31, 2018

Opening subway at My Thuy interchange from Jan 31, 2018

  • January 31, 2018
  • Articles, Market

From 04pm January 31 2018, vehicle subway at My Thuy Interchange officially open. This will make the traffic jam at Cat Lai Port Zone decrease much.

Officially opening subway at My Thuy Interchange

From Jan. 31, vehicle subway using to turning left from Vo Chi Cong street into Nguyen Thi Dinh intersection of My Thuy interchange (District 2, Ho Chi Minh City) will be put into use to reduce traffic jams around Cat Lai Port Zone.

Accordingly, vehicle subway running from Ky Ha 3 bridge crossed the existing intersection, turn left, go to Nguyen Thi Dinh to the Cat Lai Port. The length of the tunnel is 405m, including more than 80m of underground tunnel. The subway has 2 lanes, with 9m wide.

Direction Plan through My Thuy Interchange

The plan for organizing traffic direction for vehicle traveling through the subway is belong to the project of My Thuy interchange (District 2).

  • 2 – 3 wheels, pedestrian not allowed;
  • Maximum speed allowed to pass through the subway is 40km/hour.

hầm chui Mỹ Thủy - My Thuy Interchange

.The lanes on Vo Chi Cong road (from Ky Ha 3 bridge to vehicle subway) should be:

  • The two left-lanes for automobile which come into My Thuy interchange;
  • Two middle-lanes for automobile which go though vehicle subway;
  • Two other right-lanes for 2 and 3-wheels vehicles..

At the end of the old year and the beginning of the new year, the traffic of good transportation reach 89% of the South and 50% of the country, it makes main roads around Cat Lai Port (such as Nguyen Thi Dinh, Vo Chi Cong. ..) often occurs congestion.

This not only affects the socio-economic in Ho Chi Minh City but also affects neighboring areas.

In addition, the Department of Transportation Ho Chi Minh City also said that the largest port inside the city will affect the city.

In the long-term, it is necessary to reduce cargo load into Cat Lai Port, move to surrounding ports or have space to move port to the right place.

It is known that the constructor will need more sites in next days to join the overpass.

This project will have to recover more than 5.76 ha of land, affecting 150 households in Cat Lai and Thanh My Loi wards (District 2). So far the compensation, clearance, handover is still happening.

Photos at new vehicle subway at My Thuy Interchange (Cat Lai Port Zone):

Opening subway at My Thuy interchange from Jan 31, 2018 1
Opening subway at My Thuy interchange from Jan 31, 2018 2
Opening subway at My Thuy interchange from Jan 31, 2018 3
Opening subway at My Thuy interchange from Jan 31, 2018 4
Opening subway at My Thuy interchange from Jan 31, 2018 5
Opening subway at My Thuy interchange from Jan 31, 2018 6
Lê Tùng – VOVGT (30/01/2018)

Call us more

Hotline
Article's rating
★★★★★ 5/5

Share

Share on facebook
Facebook
Share on twitter
Twitter
Share on telegram
Telegram
Share on pinterest
Pinterest
Share on linkedin
LinkedIn
Share on reddit
Reddit
Share on vk
VK
Share on email
Email
Share on print
Print
PrevPreviousGem Riverside Project – A tiny European in Saigon
NextBen Van Don, the most expensive street in Saigon 2018Next
ihousel, called [aɪˈhaʊsəl], former Hoang Ngoc Real, is a Property Agency. We help people to invest or own a property.
Read more

Contact us

  • 46/41/38 Vuon Chuoi st., Dist. 3, Ho Chi Minh City, Vietnam
  • ① +84 903 68 2415
  • ② +84 938 667 155
  • info@ihousel.com

Newsletter subscribe

© 2017 by LAC™

  • About
  • Privacy
  • Terms of use
  • Contact

Follow us on

Facebook-f
Instagram
Twitter
Linkedin-in
Youtube
Pinterest
  • Call our Hotline
  • News
  • Projects
  • Buy
  • Rent
  • Listing
  • FAQs
Menu
  • Call our Hotline
  • News
  • Projects
  • Buy
  • Rent
  • Listing
  • FAQs
  • VITiếng Việt(VI)
Facebook-square
Instagram
Youtube
Twitter
Linkedin
Pinterest
Telegram